Most floor problems in London houses aren’t in the floor you walk on. They’re underneath it. A squeak, a bounce in the middle of the room or a crack along a tile joint usually means something has moved in the joists, the boards or the base. Putting new oak on top doesn’t fix that.
So a floor renovation starts with lifting a few boards and looking.
What’s usually under a Victorian floor
Most houses built before the 1930s have suspended timber ground floors. Joists sit on small brick sleeper walls, with a void of a few hundred millimetres above the soil. Air bricks in the outside walls keep that void ventilated.
Over a hundred years, those air bricks get blocked. Paths get raised above them, extensions get built over them, and people fill them in to stop draughts. Without air moving, the void gets damp and the timber starts to rot. The ends of the joists, where they sit in the wall, go first.
Building Regulations Part C puts it plainly:
“The walls, floors and roof of the building shall adequately protect the building and people who use the building from harmful effects caused by— (a) ground moisture; (b) precipitation including wind-driven spray; (c) interstitial and surface condensation; and (d) spillage of water from or associated with sanitary fittings or fixed appliances.”
Building Regulations 2010, Schedule 1, Part C2
Wet rot stays where the wood is wet. Dry rot is worse. The fungus, Serpula lacrymans, can spread through brickwork to reach dry timber some distance away, and it leaves wood cracked into cubes that crumble in your hand. If you find white strands or a mushroom smell under the floor, it needs treating before anything else is done.
Subfloor repairs
Typical repairs on an old floor:
- replacing rotten joist ends, or bolting new timber alongside the old ones;
- rebuilding sleeper walls that have sunk or lost their damp-proof course;
- clearing and reopening air bricks, or adding new ones;
- refixing or replacing loose boards with screws instead of nails.
Electricians and plumbers have often cut notches into the joists over the years. There are rules for that. Notches should be in the top of the joist, no deeper than an eighth of its depth, and only near the ends. Holes should be drilled through the middle of the depth, not cut from the bottom. A joist notched halfway through in the middle of the span is the usual cause of a bouncy floor, and it needs strengthening.
Solid concrete floors have different problems. Old ones often have no damp-proof membrane, so moisture comes up through the slab and lifts timber or vinyl on top. Fixing that means a liquid damp-proof membrane, a new screed, or in bad cases breaking out the slab.
Insulating while the floor is up
Lifting a suspended timber floor is the cheapest moment to insulate it. Mineral wool or rigid boards go between the joists, supported from below, with a membrane to stop draughts. On a Victorian house that one job makes a big difference to how cold the ground floor feels.
If you replace or renovate more than half of a floor, the building regulations may require it. Regulation 23 says:
“Where the renovation of an individual thermal element— (a) constitutes a major renovation; or (b) amounts to the renovation of more than 50% of the element’s surface area; the renovation must be carried out so as to ensure that the whole of the element complies with paragraph L1(a)(i) of Schedule 1, in so far as that is technically, functionally and economically feasible.”
Building Regulations 2010, regulation 23(1)
A ground floor counts as a “thermal element”. In practice, building control rarely gets involved in replacing floorboards, but if you’re taking a whole ground floor up, it’s worth doing the insulation anyway.
Levelling
Old floors are rarely flat. A drop of 20 or 30 mm across a room is normal in a Victorian terrace.
For carpet that doesn’t matter much. For large-format tiles, engineered boards with tight joints, or LVT, it does. Tile manufacturers usually want the base within a few millimetres over two metres. On timber floors, that means packing joists or overboarding with ply. On concrete, a self-levelling compound, which has to dry before anything goes on top.
A sand and cement screed dries at roughly a millimetre a day for the first 40 mm or so, slower after that. Timber floors laid on a damp screed cup and lift. Moisture readings should be taken before fitting, not guessed.
Choosing the finish
Original pine boards in a Victorian house can often be sanded and oiled. Many were never meant to be seen. They were laid under carpet or rugs, so gaps between them are common. Those can be filled with slivers of timber glued in.
Solid oak moves with humidity, more than engineered boards. Engineered boards have a thin oak top layer on a stable core, and they’re the safer choice over underfloor heating.
Porcelain tiles are hard-wearing and work well with underfloor heating. They need a rigid, flat base, and on a timber floor that usually means an extra layer of ply or tile backer board. There’s more on choosing porcelain tiles in our guide.
LVT and vinyl are thin. Every bump in the floor underneath will show through.
Underfloor heating
Underfloor heating can go in during a floor renovation. Electric mats are thin and suit single rooms like bathrooms. Water systems run off the boiler or a heat pump and suit larger areas, but need more depth, either in a screed or in panels between joists.
On a suspended floor, insulation under the pipes matters, or most of the heat goes into the void. More detail in everything you need to know about underfloor heating.
Flats
In flats, floors are about the neighbours as much as the room. Most London leases require carpet or a certain level of sound insulation, and many ban hard floors without the freeholder’s consent. Swapping carpet for wood without the right acoustic underlay is one of the most common causes of disputes in mansion blocks.
Check the lease before ordering anything.
How long it takes
Sanding and finishing an existing floor is usually a few days per room. Lifting boards, repairing joists and insulating adds a week or so for a typical ground floor. Anything involving a new screed depends on drying time, which can be weeks.
The finished floor is the last thing in, after the plastering, decorating and kitchen fitting are done.

Find Builders Near Me
Looking for a reliable local team in London? Force Builders is here — ready to take on your next project with quality, care, and experience you can trust.
Contact usWhy Choose Us
Built on Trust. Focused on Quality. Committed to You.
Over 25 Years of Experience
Two decades of projects across London — from small renovations to full-scale builds. We know what works, what lasts, and how to get it right the first time.
Certified & Professional Team
Every project is handled by skilled, qualified tradespeople who take pride in their craft. No shortcuts, no guesswork — just reliable workmanship.
Fast, Accurate & Reliable
We plan carefully, work efficiently, and keep you updated every step of the way. Deadlines matter — and we make sure to meet them.
Customer Support
Questions, updates, or emergencies — we’re always just a call away. Because great service doesn’t end when the tools are packed away.

See Our Work. Experience the Difference.
Every project tells a story — of vision, precision, and craftsmanship. From full home refurbishments to bespoke extensions and luxury interiors, our portfolio showcases real transformations made for real London homes.
Discover moreThinking about Floor Renovation?
Talk it through with Force Builders Ltd — straight answers, no obligation. Over 25 years building across London.