There’s no legal definition of an orangery. Planning law doesn’t use the word, and neither do the building regulations. What separates it from a conservatory in practice is how much of it is glass, and that decides which rules apply, how warm it is in January and what it costs.
Where the names come from
Orangeries started as buildings for keeping citrus trees alive through the English winter. There’s one in London that’s still standing: the Orangery at Kensington Palace, built in 1704 and 1705 for Queen Anne. Kew has another from 1761. Both are mostly brick and stone, with tall windows down one side. That’s still roughly what an orangery is today.
Conservatories took off with the Victorians, partly because of a tax. Glass was taxed by weight from 1746 to 1845, which kept it expensive. Once the tax went, glass got cheap, and within a few years there was the Crystal Palace in Hyde Park for the Great Exhibition of 1851. Glazed rooms on the back of houses followed.
What actually counts as a conservatory
The old building regulations guidance gave a working rule that the trade still uses. A conservatory has at least 50% of its wall area glazed and at least 75% of its roof glazed or translucent. Anything more solid than that, which includes most orangeries with a flat roof and a lantern, is treated as an ordinary extension.
That difference matters because of an exemption in Schedule 2 of the Building Regulations 2010. Class 7 exempts:
“The extension of a building by the addition at ground level of— (a) a conservatory, porch, covered yard or covered way; or (b) a carport open on at least two sides; where the floor area of that extension does not exceed 30m², provided that in the case of a conservatory or porch which is wholly or partly glazed, the glazing satisfies the requirements of Part K4, K5.1, K5.2, K5.3, and K5.4 Part N of Schedule 1.”
Building Regulations 2010, Schedule 2, Class 7
So a conservatory under 30 m² at ground level usually doesn’t need building regulations approval. To stay exempt, it has to be separated from the house by external-quality walls, windows or doors, and it can’t be heated by extending the house’s central heating. The glazing rule in Part K4 still applies:
“Glazing, with which people are likely to come into contact while moving in or about the building, shall— (a) if broken on impact, break in a way which is unlikely to cause injury; or (b) resist impact without breaking; or (c) be shielded or protected from impact.”
Building Regulations 2010, Schedule 1, Part K4
In practice that means toughened or laminated safety glass in doors and low-level panes.
An orangery almost never qualifies, so it’s built and inspected like any extension of the house: foundations, insulation to current standards, building control sign-off and a completion certificate at the end.
The trap with knocking through
A lot of people build a conservatory, then a year later take out the patio doors between it and the kitchen to make one open room. At that point it’s no longer separated from the house, and the exemption is gone. The conservatory now has to meet the same energy standards as an extension, which a mostly glass room with a thin roof usually can’t.
The same goes for replacing a glazed or polycarbonate roof with a solid tiled one. It’s a popular fix for conservatories that are too hot or too cold, and it usually needs building regulations approval, because the roof is no longer translucent and the structure has to carry a heavier load.
If you think you’ll want it open to the kitchen eventually, it’s usually cheaper to build an orangery or an extension in the first place.
Planning permission
For planning, there’s no difference at all. Both are single-storey extensions under Class A of the General Permitted Development Order 2015. The basic limit for a rear extension:
“the enlarged part of the dwellinghouse would have a single storey and— (i) extend beyond the rear wall of the original dwellinghouse by more than 4 metres in the case of a detached dwellinghouse, or 3 metres in the case of any other dwellinghouse, or (ii) exceed 4 metres in height”
GPDO 2015, Schedule 2, Part 1, Class A.1(f)
On most London terraces and semis that’s 3 metres. Outside conservation areas there’s a larger home extension route that allows up to 6 metres, but the council has to be notified and the neighbours can object. In a conservation area, at a listed house or for a flat, you’ll need planning. Conservation officers in London tend to be stricter about uPVC conservatories than about brick orangeries with timber or aluminium glazing.
Warm in winter, cool in summer
This is where most conservatories disappoint. A south-facing glazed roof in a London garden in July can make the room unusable by midday. The same room in January loses heat fast. Polycarbonate roofs are also loud in heavy rain.
Modern solar-control glass and opening roof vents help a lot. So does facing the room north or east if you have a choice, though on a terrace you usually don’t. Blinds on a glass roof are expensive and fiddly to clean.
An orangery has the same problem in a smaller dose. Most of the roof is solid and insulated, with a lantern in the middle for light. The walls are partly brick. It behaves much more like a normal room, which is why people use them as kitchen-diners and family rooms all year.
What goes into the build
Both need proper foundations. Old conservatories in London are often built on shallow footings that move with the clay, and cracking where the dwarf wall meets the house is common. On London clay, with trees nearby, foundations may need to go a metre or more deep. If you’re digging within three metres of a neighbour’s building and going below their foundations, a party wall notice is needed at least a month before.
Where the new room meets the house, the junction has to be flashed properly into the brickwork. Badly sealed junctions are the most common cause of leaks.
Roof lanterns and large aluminium sliding or bi-fold doors usually have lead times of six to ten weeks, so they need ordering early. A typical orangery is around eight to twelve weeks on site. A conservatory on a prepared base can go up much faster, sometimes a couple of weeks.
Cost, roughly
Prices vary a lot, but as a rough guide in London, a good quality conservatory of 12 to 15 m² is often £20,000 to £40,000 installed. An orangery of the same size, with brick piers, an insulated roof and a lantern, is closer to a single-storey extension and often £45,000 to £80,000 or more, depending on finishes and the glazing.
The orangery costs more because it’s more building. The conservatory costs less, but it’ll be a different kind of room.
Which one fits
| Option | Usually better when… | Rules | Main caution |
|---|---|---|---|
| Conservatory | You want a garden room, kept separate from the house | Often exempt from building regs under 30 m² | Overheating, heat loss, exemption lost if opened up |
| Orangery | The room will be used every day, open to the kitchen | Treated as an extension, needs building regs | More expensive, longer build |
Before choosing, decide whether the room will be closed off from the house or open to it. That one decision usually settles the question. There’s more on design and glazing options on our conservatories and orangeries page.
Planning a project in London?
Talk it through with Force Builders Ltd — straight answers, no obligation. Over 25 years building across London.
Force Builders Ltd is a London building company (Companies House 07049787) delivering house extensions, loft conversions and full refurbishments across Greater London. See our projects or get in touch.