On most London terraces the kitchen is in the back addition, behind the dining room, often facing north and shut off from the garden by a solid wall. In the 1880s the back addition usually held the kitchen range and, behind it, a scullery with a sink and a copper for the washing. It was never laid out for the way people cook and eat now. That’s why so many house extension jobs in London start with the kitchen: no arrangement of units fixes a room that’s the wrong shape.
What changes
Light first. A glazed roof or rooflights over the new part bring daylight into the middle of the ground floor, where a window in the back wall can’t reach. On the Chiswick rear extension, a small cold rear structure was rebuilt from the footings with a flat roof and two skylights. The extra floor mattered less than the back of the house no longer being dark.
Then space. A typical London kitchen extension adds 12 to 25 m². That’s enough for a table, an island and a run of units with room to pass, not much more.
Value is less certain. A well-built extension usually recovers a good part of its cost when the house sells, depending on the street and the finish. One that’s badly detailed, or takes too much of a small garden, can put buyers off.
Old London houses often show the opposite of today’s glass. Some of the bricked-up windows on Georgian and early Victorian fronts are left over from the window tax, charged on the number of windows from 1696 until it was repealed in 1851.
Three layouts
Almost every kitchen extension in London is one of three shapes, and the house usually picks.
Rear extension
Out from the back wall into the garden. On a terrace or semi it’s the simplest to build. You give up garden depth and get a longer, wider room.
It suits a garden long enough to lose 3 metres and a back wall that isn’t carrying anything awkward.
Side return
The narrow passage beside the outrigger, usually holding bins and a drain. Filling it squares off the L-shaped room and costs no garden. It’s fiddly: tight access, a boundary wall along the whole length and drains in the way. The comparison is covered in more detail in side return vs rear extension.
Wraparound
Both at once. The biggest gain and the biggest bill, and usually a full planning application. See wraparound and double storey extensions.
Cost in London
These are rough ranges for the building work only. Kitchen units, appliances and worktops are extra and vary more than the build does.
| Type | Typical size | Build cost range |
|---|---|---|
| Small rear extension | up to 15 m² | £45,000 – £70,000 |
| Standard rear extension | 15 – 25 m² | £70,000 – £110,000 |
| Side return | 10 – 18 m² | £60,000 – £95,000 |
| Wraparound | 25 – 35 m² | £110,000 – £165,000 |
Add roughly 10 to 15% for the architect and structural engineer, plus council fees and VAT. Keep around 10% back for what turns up on an older house: cracked clay drains, footings that stop at a couple of courses of brick, or a wall carrying more than it looks.
What pushes a job to the top of its range is usually structural. Deeper footings, longer steel spans and moving drains. Large sliding doors and a roof lantern add cost too, but those are a choice.
Planning permission
Many single-storey rear extensions are permitted development under Class A of the 2015 Order. On a terrace or semi that’s up to 3 metres beyond the original rear wall, 4 metres on a detached house, no more than 4 metres high, and eaves no higher than 3 metres within 2 metres of a boundary.
The larger home extension route allows 6 metres on a terrace or semi and 8 on a detached house, outside conservation areas. It isn’t automatic. The council writes to the neighbours, and if any of them object, the council has to look at the effect on them:
“Where any owner or occupier of any adjoining premises objects to the proposed development, the prior approval of the local planning authority is required as to the impact of the proposed development on the amenity of any adjoining premises.”
GPDO 2015, Schedule 2, Part 1, Class A.4(7)
The council has a fixed time to decide, and if it says nothing, you can go ahead:
“the expiry of 42 days following the date on which the information referred to in sub-paragraph (2) was received by the local planning authority without the local planning authority notifying the developer as to whether prior approval is given or refused.”
GPDO 2015, Schedule 2, Part 1, Class A.4(10)(c)
In practice most councils do issue a decision within the 42 days. It’s worth getting it in writing, because a buyer’s solicitor will ask for it.
Conservation areas and listed buildings work differently, and a lot of London is in one. What a neighbour built in 2019 isn’t a guide, as rules and council policies change. The planning and design stage is where this is checked, before drawings are detailed.
Permitted development and building regulations are separate, and you need both.
Building regulations in a kitchen
Building control looks at structure, drainage, fire and insulation, the same as any extension. Two parts matter more in a kitchen.
Ventilation is Part F. For a kitchen that means an extractor ducted to outside, not a recirculating hood on its own, plus background ventilation. When the extension wraps round an existing room, that room can lose its only window, and it then needs ventilation through the new space or a fan of its own. Extract ducts have to be planned before the ceiling goes up.
Energy is Part L, and it’s what limits glazing. The guidance caps the area of windows, doors and rooflights in an extension at broadly 25% of its floor area, plus the area of any windows or doors the extension covers up. A kitchen with a full-width slider and a large lantern often goes over that, and the designer then has to show by calculation that the rest of the building makes up for it.
The party wall
On a terrace the new steel usually bears on the party wall, and the flashing for the new roof is chased into it. The Party Wall etc. Act 1996 lists that as a right the building owner has, as long as notice is served:
“to cut into a party structure for any purpose (which may be or include the purpose of inserting a damp proof course)”
Party Wall etc. Act 1996, section 2(2)(f)
The notice for section 2 work is two months. If the neighbour agrees in writing, work can start sooner. If they dissent, or don’t reply within 14 days, surveyors are appointed and an award is drawn up, which can take several weeks. Serving notice as soon as the drawings show where the steel goes keeps it off the critical path.
How long it takes
The approvals take longer than most people expect.
Design, drawings and structural calculations are usually four to eight weeks. Planning, if you need it, is eight weeks from validation and often longer. Prior approval is up to 42 days. Building regulations run alongside. Realistically it’s three to five months from the first measured survey to the first dig.
A straightforward rear extension is then ten to sixteen weeks on site. Groundwork and foundations take the first two or three, and that stage looks slow because most of it ends up below ground. On the Chiswick job the footings went deeper than the original, in reinforced concrete, and the drains inside and outside were renewed before any walls went up.
Then walls, steel and the roof. Then insulation, slab, membranes and screed. A sand and cement screed needs weeks to dry before a floor can go down. Then plasterboard and skim.
The kitchen fit-out comes last and needs three to four weeks. Plumbing and electrics are first-fixed while the walls and floor are open, so the layout has to be fixed by then.
What goes wrong most often
Leaving the kitchen layout until the build is nearly done. Sockets, water, waste and extract ducts go in while the walls are open. Move the island in week nine and the floor or walls get opened again. Fix the layout at drawing stage, even if the units are chosen later.
Underestimating the ground. Old drains, shallow footings and a neighbour’s extension already on the boundary don’t show on drawings. They show when the digging starts.
Glazing without thinking about July. A south-facing roof lantern is good in March and too hot in summer. Solar-control glass, blinds, or a smaller opening in a better place.
Cutting insulation because it ends up behind plasterboard. It’s the difference between a room you use in January and one you shut off.
Choosing on price alone. A quote well below the others has usually left something out, and it comes back later as an extra.
Frequently Asked Questions
How much does a kitchen extension cost in London?
Build cost is roughly £45,000 for a small rear extension up to £165,000 or more for a wraparound, before units, appliances and VAT. Groundwork, steel and glazing are the main variables.
Do I need planning permission for a kitchen extension?
Often not. A single-storey rear extension up to 3 metres on a terrace or semi, or 4 metres detached, is usually permitted development, and up to 6 or 8 metres through prior approval. Building regulations approval is always needed.
How long does a kitchen extension take to build?
Ten to sixteen weeks on site for a standard rear extension, after three to five months of design and approvals. The kitchen fit-out adds three to four weeks at the end.
Can I stay in the house during the work?
Usually yes. Expect several weeks without a kitchen and the back of the house open for part of the build, so most people set up a temporary kitchen in another room.
Does a kitchen extension add value to a London property?
Generally yes, but not always pound for pound. A well-proportioned, well-finished extension usually recovers most of its cost; one that takes the whole garden or looks cheap can do the opposite.
What’s the difference between a rear extension and a side return?
A rear extension goes out into the garden and adds depth. A side return fills the passage beside a Victorian terrace’s outrigger and adds width without losing garden. A wraparound does both.
Seeing one built
The full sequence of a London rear extension, from demolition to finish, is on the Chiswick project page. Kitchen design and fit-out are covered under kitchens and bathrooms.
Planning a project in London?
Talk it through with Force Builders Ltd — straight answers, no obligation. Over 25 years building across London.
Force Builders Ltd is a London building company (Companies House 07049787) delivering house extensions, loft conversions and full refurbishments across Greater London. See our projects or get in touch.