Commercial Design and Build in London: How It Works and What It Costs

On a traditional commercial job, the design is finished first and then priced by contractors. Six weeks into the build someone opens a ceiling and finds the building doesn’t match the drawings. The contractor priced what he was given. The architect says the contractor should have surveyed it. Both are partly right, and the client pays for the extra work while they argue about it.

Design and build is the procurement route set up to avoid that gap.

What design and build means

One contract, and one company responsible for both the design and the construction.

The contractor is appointed early, often before the design is finished, and takes on the drawings, the structural engineering, the building control application and the build. If a detail doesn’t work on site, it gets solved inside the same team. There’s nobody else to pass it to.

The traditional route splits it: designer first, contractor second, with a tender in between. That still suits some jobs. If you want full control over every specification and have time to finish the design before anyone prices it, traditional can be the better fit. Design and build gives up some control over the design in exchange for speed and a single point of responsibility. Working out which of those matters more is the first decision.

Most businesses that go for design and build do it for one reason. The space has to be open and trading by a fixed date.

Why businesses choose it

Speed comes first. Design and construction overlap instead of running one after the other, so strip-out and enabling works can start while the fit-out details are still being drawn. On a straightforward office or shop, that overlap can take four to six weeks out of the programme.

Cost certainty comes second. A fixed price against an agreed specification arrives earlier than it would with a tender, and fewer variations come up when the drawings meet the building. There will still be some.

The third reason is decisions on site. When the electrician needs an answer about a wall that isn’t where the drawing shows it, that gets sorted between two people working for the same firm.

The planning side: Class E

Since 1 September 2020, most shops, cafés, restaurants, offices, gyms and clinics have been in one use class. The Use Classes Order defines Class E as use for:

“the display or retail sale of goods, other than hot food, principally to visiting members of the public … for the sale of food and drink principally to visiting members of the public where consumption of that food and drink is mostly undertaken on the premises … an office to carry out any operational or administrative functions”

Town and Country Planning (Use Classes) Order 1987, Schedule 2, Class E (as amended 2020)

A change of use within Class E isn’t development, so a shop can become an office or a restaurant without a planning application, unless a condition on an earlier permission says otherwise. Check the planning history before signing a lease.

The same 2020 change took pubs and hot food takeaways out of the old A classes and made them “sui generis”, their own category. Turning a restaurant into a takeaway, or a shop into a pub, still needs planning permission. So do external works: a new shopfront, an extraction duct up the back wall, or anything visible in a conservation area. Signs usually need advertisement consent, which is a separate application.

Offices and fit-outs

Partitions, ceilings, lighting, data, air conditioning, tea points and WCs. Office landlords and agents often talk about “Cat A” and “Cat B”. Cat A is the landlord’s basic finish: raised floors, suspended ceilings, lighting and services. Cat B is the tenant’s own layout on top of it, which often means taking some of the Cat A out again.

Most London office work is general building plus services coordination. The services usually decide the programme, not the partitions. Air conditioning units and switchgear can have lead times of several weeks.

Shops and retail

Retail runs to a different clock. There’s usually an opening date that can’t move, and a landlord’s licence for alterations that has to be signed before anything starts. Shopfronts, flooring, lighting, back-of-house and enough electrical capacity to run all of it.

Shops open to the public have to meet Part M of the Building Regulations when they’re altered:

“Reasonable provision shall be made for people to— (a) gain access to, and (b) use the building and its facilities.”

Building Regulations 2010, Schedule 1, Part M1

The same requirement then says it doesn’t apply to “an extension of or material alteration of a dwelling”. So it’s a commercial rule. In practice it means a level or ramped entrance where possible, door widths a wheelchair gets through and, where WCs are provided, usually an accessible one. On a Victorian shop with a step at the door, the entrance is often the hardest part of the design.

Bars and restaurants

This is the most technically demanding commercial work and the least forgiving. Commercial kitchens need extraction, a gas interlock that shuts the gas off if the extraction fails, grease management and drainage that satisfies building control, environmental health and Thames Water, which takes fats and grease in sewers seriously. Kitchen floors usually get resin. Everywhere else needs something that survives being mopped twice a day. Acoustic separation matters if there are flats above, and in London there usually are.

The Cleveland Arms in Paddington is a good example of how much of this ends up in one building: a pub on the ground floor, a restaurant built into the old basement and three apartments above, over roughly eighteen months. The basement had been a beer cellar and cold room. It needed full damp-proofing, new concrete subfloors, structural steel to carry the building above and waterproofed pavement lights. It was also a heritage building, so the façade work went through conservation guidance. The exterior work and the full renovation are written up separately.

The operator still has to apply for a premises licence under the Licensing Act 2003 and register the food business with the council, normally at least 28 days before opening.

Small works and maintenance

Not every job is a fit-out. A lot of commercial work is a partition moved, a WC refurbished, or a shopfront repaired after a van reversed into it. Reactive work, such as extraction or drainage failures out of hours, is its own category, because a business can’t wait for the next available slot.

Fire safety after the work

Commercial premises are covered by the Regulatory Reform (Fire Safety) Order 2005, which replaced the old fire certificates in 2006. It puts the duty on the “responsible person”, usually the employer or the person in control of the premises:

“The responsible person must make a suitable and sufficient assessment of the risks to which relevant persons are exposed for the purpose of identifying the general fire precautions he needs to take”

Regulatory Reform (Fire Safety) Order 2005, article 9(1)

Article 9(3) adds that the assessment has to be reviewed when “the premises … undergo significant changes, extensions, or conversions”. A fit-out nearly always counts. New partitions change the escape routes, a new kitchen changes the fire risk, and a suspended ceiling can hide gaps in compartment walls.

Building control signs off the work against the Building Regulations. The fire risk assessment after that is the occupier’s job. It’s easier when the as-built drawings, the fire alarm certificate and the emergency lighting certificate are handed over at the end.

How a project runs

Stage one is the survey. Measure what’s there, open up where needed, and find out what the building actually is. A problem found in week one costs a fraction of the same problem found in week nine.

Stage two is design and specification: layouts, services, finishes and the structure behind them. The design and planning work, including the building control application, happens here. If planning is needed for a shopfront, extraction or change of use, it goes in now, and its decision date sets the programme for everything else.

Stage three is pricing and programme. A fixed price against a written specification, with exclusions listed and real dates on the programme.

Stage four is the build, with weekly site meetings and a written record of every decision that changes the scope. The pre-construction planning decides the sequence. Order matters more on a commercial job than a domestic one, because the work is usually fitted around someone else.

Stage five is handover: commissioning, certificates and the snag list. Extraction, air conditioning and alarms get tested and demonstrated, not just switched on.

When the HSE needs to know

Every commercial job falls under the Construction (Design and Management) Regulations 2015, and bigger ones have to be notified:

“A project is notifiable if the construction work on a construction site is scheduled to— (a) last longer than 30 working days and have more than 20 workers working simultaneously at any point in the project; or (b) exceed 500 person days.”

CDM 2015, regulation 6(1)

Regulation 6(2) puts the duty to notify on the client, not the contractor. It’s done online on the HSE’s F10 form, and a copy has to be displayed in the site office. On a commercial job the client’s CDM duties don’t pass to the contractor automatically the way they do for a homeowner, so a business needs to know who is doing it.

Working around a live business

If the business keeps trading during the works, the programme has to be built around that from day one. That usually means phasing, half the floor at a time or back-of-house first. Sometimes it means night working, which costs more per hour but can cost less overall because trading doesn’t stop. Dust screens have to seal properly, and materials need a route that doesn’t cross the customers’ path.

Agree the noisy work in advance and stick to it. Breaking out a floor at eleven in the morning next to a café’s seating is a quick way for them to lose their regulars.

Most commercial leases need the landlord’s consent for alterations, and the licence can take weeks. Start that conversation before pricing the job, not after.

What it costs

Commercial cost per square metre varies more than domestic work, so a single figure would mislead. What moves it is more useful to know.

Specification moves it most. A basic office refit and a high-end restaurant can differ by a factor of three for the same floor area. Services come next: new extraction, more electrical capacity, air conditioning and drainage changes are what turn a modest job into a big one. Then the building. A 1970s unit with generous risers is far easier to service than a listed Victorian building where every route has to go through something protected.

Phasing and out-of-hours working add cost. So does a compressed programme. Since April 2023, landlords also can’t continue letting most commercial property with an EPC rating below E, so some fit-outs end up including insulation or lighting upgrades that weren’t in the original brief.

A quote that hides its assumptions usually leads to variations later. Read the exclusions before comparing totals.

Frequently Asked Questions

What is commercial design and build?

A single contract covering both the design and the construction of a commercial project. One company does the drawings, the structural and building control work and the build, so responsibility sits in one place.

How is design and build different from traditional contracting?

In the traditional route the design is finished first and then tendered. Design and build appoints the contractor early and overlaps the two stages, which is usually faster, while traditional gives more control over the detailed specification.

How long does a commercial fit-out take in London?

A straightforward office or shop typically takes eight to sixteen weeks on site, plus four to eight weeks of design and approvals. Restaurants and bars take longer, and a multi-floor refurbishment can run over a year.

Can you work outside business hours?

Yes. Night and weekend working is common on retail and hospitality jobs where trading can’t stop. It costs more per hour but often shortens the programme, so it’s worth pricing both ways.

Do you handle building control and licensing?

Under design and build, the building regulations application and structural approvals sit with the contractor, and planning or change of use can too. Premises licences, food business registration and the fire risk assessment stay with the operator.

What size of commercial projects do you take on?

Anything from a single-room alteration or reactive repair up to a full multi-storey refurbishment like the Cleveland Arms. The commercial construction page covers the types of work in more detail.

Planning a project in London?

Talk it through with Force Builders Ltd — straight answers, no obligation. Over 25 years building across London.

Force Builders Ltd

Force Builders Ltd is a London building company (Companies House 07049787) delivering house extensions, loft conversions and full refurbishments across Greater London. See our projects or get in touch.