Why High-End Builders Are the Key to Luxury Construction in London

Most of the high-end work in London is in old houses. Victorian and Georgian terraces, mansion flats, big semis in Hampstead and Kensington. The budgets are large but the buildings are 120 to 200 years old, and they don’t care what the budget is.

Here’s what that work involves on site, and where the time and money actually go.

Walls and floors first

On a normal refurb, a wall that’s a few millimetres out over two metres gets painted and nobody notices. On a high-end job it shows. Flush doors with no architrave, shadow-gap skirting, large porcelain tiles, polished plaster. All of them show every dip in the wall.

So a lot of the time goes into getting walls and floors true before anything nice goes on them. Old lath and plaster often comes off completely. Floors get levelled, sometimes with new joists or a new screed.

Stone worktops are templated after the base units are fitted, not from the drawings. If the units go in on a floor that isn’t level, the stone won’t sit right, and it’s very expensive to remake.

Drying times

A sand and cement screed dries at roughly a millimetre a day for the first 40 mm or so, slower after that. A 75 mm screed can need two to three months before timber flooring goes on it. Engineered oak laid on a wet screed will cup or lift.

Plaster needs drying time before decorating too. Polished plaster and lime need more again.

These dates can’t really be pushed. The programme has to be built around them.

Old buildings and old work

Lift the floorboards in a London house and you’ll usually find something. Joists notched halfway through by an electrician in the 1970s. A chimney breast removed downstairs with nothing holding up the one above. Lead water pipes. Old wiring that’s been extended so many times nobody knows where the circuits go.

On houses built before 2000 there should be an asbestos survey before anything is stripped out. It turns up in artex ceilings, floor tiles, old boiler flues and pipe lagging.

None of this shows on the architect’s drawings. A contingency of 10% is fine for a newer house. On a period house 15 to 20% is more realistic.

Paperwork before the work

A lot of the houses are in conservation areas and some are listed. Work on a listed building without listed building consent is a criminal offence, and that includes internal work like taking out old fireplaces or changing windows. In a conservation area there may also be an Article 4 direction that removes permitted development rights. Check this with the planning team before ordering windows or doors.

Party wall notices go to neighbours two months before work on a shared wall, and one month before digging foundations within three metres of their building. If they don’t agree, each side appoints a surveyor and the award has to be in place before that work starts.

Kensington and Chelsea, Westminster and Camden usually want a Construction Management Plan for basements and bigger jobs. It covers deliveries, lorry routes, noise and dust. Parking bay suspensions and skip or scaffold licences come from the council and take a couple of weeks.

Most boroughs allow noisy work 8am to 6pm on weekdays and 8am to 1pm on Saturdays. No noisy work on Sundays or bank holidays.

Services hidden in the walls

High-end houses carry a lot of kit. Underfloor heating, mechanical ventilation with heat recovery, lighting control, speakers, CCTV, data points in every room. On a new build there’s room to plan for it. In a period house it all has to be squeezed into old walls and floors.

The manifold for the underfloor heating and the MVHR unit are bigger than people expect and both need access for servicing. They need a home on the drawings before first fix.

Every cable has to be in before plastering. Changing a lighting layout after the ceiling is boarded and skimmed means cutting holes, patching and repainting the whole ceiling.

The usual clash is steel. The structural engineer puts a beam where the lighting designer wanted recessed fittings, or a flush ceiling detail leaves no depth for ventilation ducts. Cheap to fix on paper. Expensive after the ceiling is up.

Lead times

Bespoke joinery is usually 8 to 12 weeks from signed drawings. Natural stone 6 to 10 weeks, longer if it’s coming from a particular quarry. Steel windows and crittall-style doors 10 weeks or more. Some Italian kitchens are 12 to 16 weeks.

These have to be chosen and signed off while the shell is still being built. Choosing taps a week before the plumber needs them doesn’t work.

Waterproofing and things nobody sees

Full tanking on walls and floors in showers and wet rooms, not just round the tray. Leaks behind tiles are the most common reason high-end bathrooms get ripped out after a few years.

Solid brick walls in period houses need to breathe. Gypsum plaster and modern paint on those walls can trap damp. Lime plaster is slower and more expensive but usually the right material.

Pipework gets pressure tested before floors are closed up. Access panels go where valves and pumps are, because sooner or later someone needs to get to them.

Flats

Top-floor and penthouse apartment work has its own problems. The building’s freeholder or managing agent usually needs a licence to alter before work starts, which can take weeks. Many leases restrict working hours more than the council does. Everything comes up in a shared lift or by hand, and floors need acoustic insulation that meets the lease, especially if hard floors are going in.

Extensions on high-end houses

On a house extension to a period property, matching the brick is often the hardest part. Reclaimed London stock bricks cost a lot more than new ones and supply varies. Conservation officers often want the extension to look clearly modern or exactly matching, nothing halfway.

Large sliding glass doors need a steel frame designed for the deflection of the glass. Order the doors first, then design the steel, not the other way round.

Comparing quotes

Quotes for high-end building work can differ a lot on the same drawings. Usually the difference is in what’s included. Things to check line by line:

  • preparation of walls and floors, and who decides when they’re good enough;
  • contingency, and how it’s spent;
  • provisional sums for items not chosen yet, like kitchens, stone and lighting;
  • how changes are priced and agreed;
  • who is on site every day and who manages the job.

A low provisional sum for the kitchen or stone makes a quote look cheaper than it is. Those numbers will go up once the real items are chosen.

Seeing finished work in person tells you more than photos. Look at door junctions, skirting lines, tile joints and how the floor meets the walls.

Looking for a high-end builder in London?

Talk it through with Force Builders Ltd — straight answers, no obligation. Over 25 years building across London.

Force Builders Ltd

Force Builders Ltd is a London building company (Companies House 07049787) delivering house extensions, loft conversions and full refurbishments across Greater London. See our projects or get in touch.

Ready to start your project?

Contact us
Call us today077 6525 5189
Call now Get a quote